Significant Traffic Delays for I-95 Work in Delaware. Seek Alternate Routes

Work expected through the end of September 2022.

1026
I-95 Traffic | I-95 Construction | Wilmington, Delaware | I-95 Exit Guide

The Delaware Department of Transportation reports that the I-95 Restore the Corridor project will require a change in the current I-95 Southbound traffic pattern near Exit 8 (US 202).

The two southbound lanes merge into a single lane just prior to the US 202 southbound on-ramp to allow for drainage and traffic barrier work in the median and along the right shoulder. The traffic pattern is anticipated to remain in place through the end of September 2022.

This change may increase traffic congestion in the area during peak travel periods. Motorists are encouraged to use I-495 to travel around the construction zone.


For more I-95 travel info, visit www.i95exitguide.com, the Internet’s largest and most complete website devoted to America’s Interstate Main Street. Detailed exit service listings… discount lodging, camping, food, gas and more for every exit from Maine to Florida!

Traveling another route? Visit our growing family of exit guides: I-4 Exit GuideI-5 Exit GuideI-10 Exit Guide and I-75 Exit Guide.

I-95 Exit Guide
The I-95 Exit Information Guide is one of the most popular travel destinations on the Internet. This website features detailed listings for exit services all along Interstate 95, from Maine to Florida.